Built around the confirmed duty
The official page describes an oil-immersed high-voltage load switch and plug-in full-range protection fuse installed with the transformer in one sealed oil tank. Low-voltage components are assembled in a separate enclosed cabinet together with the high-voltage operating mechanisms.
Working principle
High-voltage power passes through the integrated switching and fuse protection, is transformed in the sealed oil tank, and is distributed from the separate low-voltage cabinet.
Power and transmission equipment selection is based on power or torque, speed, load profile, service factor, electrical supply, mounting, environment, efficiency and integration requirements.
Core features
- Compact integrated arrangement
- Sealed oil-tank high-voltage and transformer section
- Source-described installation and cost advantages





