Photovoltaic Box-Type Substation (NEN-047)Item NEN-047

Photovoltaic Box-Type Substation

光伏箱式变电站

Photovoltaic box-type substation for converting, stepping up, monitoring, protecting and exporting PV-generated power to the grid.

Project-specific configurationOnly sourced values are shown. GoEastAI confirms remaining parameters during technical review.

Manufacturing source: Baoding Zhongyi Electric Group Co., Ltd. — Supplier Profile

Equipment overview

Built around the confirmed duty

The 2026 manual describes the photovoltaic transformer substation as a stable power-conversion and transmission package for PV generation. It converts the system output through the inverter interface, transforms it to the required grid voltage and connects through a dedicated AC circuit breaker, with monitoring and protection functions integrated into the package.

Working principle

Inverter AC output enters the box substation, is switched and transformed to the collection or grid voltage, monitored and protected, then exported through the outgoing circuit.

New-energy equipment selection requires the rated electrical or process duty, operating profile, grid or process interface, site climate, thermal management, communication and destination certification.

Core features

  • Integrated photovoltaic step-up and grid connection
  • Real-time operating monitoring described in the manual
  • Overvoltage, overcurrent and islanding protection functions
Technical parameters

Reference specification checklist

Use these common industrial selection fields to prepare the inquiry. They are not a manufacturer datasheet or guaranteed performance values.

Source-supported dataValues currently supported by supplied material
ParameterConfirmed valueBasis
Primary applicationPhotovoltaic grid connection2026 product manual, page 20
Source-listed functionsStep-up / monitoring / protection / grid output2026 product manual, page 20
Output switchingDedicated AC circuit breaker2026 product manual, page 20
Planning reference

Parameters to confirm before quotation

Final values remain subject to supplier technical review.

Swipe horizontally to view all parameter columns.

ParameterReference settingTypical unitSelection note
Rated power / production dutyProject targetkW / MWState nominal, peak and continuous operating profile
Energy capacity / process capacityApplication-specifickWh / MWh / Nm³/hUse the unit relevant to storage, hydrogen or generation
Electrical interfaceConfirm grid basisV / HzAC/DC voltage, frequency, fault level and connection point
Operating environmentSite design range°C / mTemperature, altitude, humidity, corrosion and wind conditions
Thermal managementAir / liquid / process coolingCapacity, redundancy and utility requirement
Control and communicationPlant / grid integratedEMS, SCADA, BMS, inverter or charger protocol as applicable
CertificationDestination-specificElectrical, grid, pressure, hydrogen and transport requirements
Acceptance testingAgree before orderFactory, site, performance and safety test scope
Application and configuration

Build the inquiry around the real project

Use the product type as the starting point, then confirm service conditions, options, documentation and delivery requirements.

01

Typical applications

Utility-scale photovoltaic plantsDistributed photovoltaic projectsPV collection and grid-interconnection systems
02

Materials and options

  • Winding conductor, core, insulation and enclosure materials are confirmed for the selected design.
  • Corrosion protection and environmental protection level are selected for the installation site.
  • Voltage ratio, capacity, vector group, impedance and tapping arrangement to be confirmed.
  • Monitoring, protection, enclosure, cable interfaces and accessories to be confirmed.
03

Standards and documents

  • Applicable national, IEC and destination requirements are confirmed during technical review.
  • Routine, type and special test scope is agreed in the quotation.
  • Manufacturer and model confirmation
  • Technical datasheet and dimensional drawing
  • Inspection, certificates and manuals
Supply and support

Delivery, packing and after-sales

Final scope, responsibilities and timing are confirmed in the quotation.

04

Delivery

  • Manufacturing schedule, Incoterm and shipment scope are confirmed after technical review.
  • Final delivery timing depends on the confirmed rating, configuration, testing and destination.
05

Packing and shipping

  • Export packing and moisture protection are selected for the final dimensions and transport route.
  • Bushings, instruments, loose parts and document packs are protected and identified for shipment.
06

After-sales

  • Installation guidance, commissioning support and spare-parts scope are confirmed in the quotation.
  • Warranty conditions and response responsibilities are agreed before order placement.
Similar products

Explore related equipment

Products in the same equipment family are shown first, followed by other relevant products in the same industrial system.

Request a quotation

Request this equipment directly.

The selected product is already linked to this RFQ. Add the duty, quantity, destination and any required standards so GoEastAI can prepare the correct supply proposal.

  • Equipment and intended application
  • Capacity, standard and destination
  • Drawings or specification files when available
One accountable supplierGoEastAI confirms the quotation, supply scope, delivery and after-sales responsibilities with the client.
Selected product · no category selection neededPhotovoltaic Box-Type Substation · NEN-047New Energy Industrial Equipment